





Apartment renovation in Kyiv by our studio is your way to achieve a stylish and comfortable interior without spending time and effort on organization. You won’t have to search for contractors, coordinate their work, or maintain constant oversight yourself. Our team handles everything: from developing the design project to executing construction works, sourcing materials, and manufacturing custom cabinet furniture. We provide a 36-month warranty on all our work.

69,53 м²
Kyiv, Ivana Vyhovskogo st., 42
Our studio offers three renovation formats, each designed for different tasks, requirements, and budgets.
A major renovation is suitable when an apartment requires significant updates – not only visually but also technically. This is relevant for properties in the secondary housing market or premises with worn-out utilities and outdated finishes. It is also an opportunity to change the apartment layout, making it more adapted to your lifestyle.
The most popular format. It is ideal for those who want to achieve the desired result without spending time on organizing the renovation. You only need to share your preferences and budget; our team will handle everything else. We perform the full range of work – from developing the interior concept to its precise implementation. The result is an apartment with a stylish and functional interior, completely ready for you to move in.
An excellent option for those who value exclusivity and premium quality. This is an opportunity to create an interior with complex technical solutions that will maintain the comfort of residents at the highest level. As a result, you get a unique space that emphasizes your individuality and status.
We work with properties in both new developments and old housing stock. Each of them has its own specific features.
Renovation in a new building. In this case, work begins with a “blank slate.” A major advantage is the ability to immediately implement a suitable planning solution and create your dream interior without the need to dismantle old finishes and engineering utilities.
Renovation in secondary housing. Often, apartments in the old housing stock require increased attention to the technical part: replacing old utilities and eliminating hidden defects that may appear during the renovation stage. Another feature of secondary housing renovation is the need to dismantle old finishing materials.
We do not involve third-party contractors
From design project development to turnkey implementation
We provide a 36-month warranty on renovations
We offer competitive market average prices
Get a design project as a gift when ordering a turnkey renovation
Convenient payment system divided into 4 installments

The studio team is always focused on the final result and closely monitors quality at all stages of renovation. To achieve this, we have a clear control system in place:
Do you want a beautiful and comfortable interior that perfectly suits you? We handle the entire renovation process – from the design project to the final cleaning and furniture assembly. Just call us, message us via messenger, or leave a request on the website. Our specialist will provide a free consultation and answer all your questions.
Design to implementation
1️⃣ Development of a design project
2️⃣ Repair robots:
3️⃣ Furniture preparation and equipment
4️⃣ Author's perspective and additional support at all stages of the project
Design to implementation
1️⃣ Development of a design project
2️⃣ Repair robots:
3️⃣ Furnishings and materials of the premium segment
4️⃣ Author's perspective and additional support at all stages of the project
| Work Description | Unit | Price (UAH) |
|---|---|---|
| Screed (up to 5 cm) | sq.m. | from 120 |
| Self-leveling compound pouring | sq.m. | from 70 |
| Reinforcing mesh installation | sq.m. | 40 |
| Styrofoam installation | sq.m. | from 60 |
| Coating waterproofing (2-3 layers) | sq.m. | from 60 |
| Laminate flooring installation | sq.m. | from 160 |
| Linoleum installation | sq.m. | from 90 |
| PVC baseboard installation | lin.m. | from 180 |
| Decorative threshold installation | lin.m. | from 100 |
| OSB board installation | sq.m. | from 80 |
| Click-lock quartz vinyl tile installation | sq.m. | from 160 |
| Glue-down quartz vinyl tile installation | sq.m. | from 350 |
| Underlayment | sq.m. | from 30 |
| Priming | sq.m. | 40 |
| Work Description | Unit | Price (UAH) |
|---|---|---|
| Wall plastering (cement-sand, gypsum MP 75, Rotband) | sq.m. | from 200 |
| Partition mounting (profile pitch every 40 cm) | sq.m. | from 200 |
| Drywall installation (false wall) | sq.m. | from 160 |
| Second layer drywall installation | sq.m. | from 80 |
| Wall mineral wool insulation (0.5 thickness) | sq.m. | 100 |
| Damping tape installation | sq.m. | from 30 |
| Vapor barrier installation | sq.m. | 40 |
| Wall puttying for wallpaper (1 layer) | sq.m. | from 130 |
| Wall puttying for painting (1 layer) | sq.m. | 140 |
| Cutting non-standard drywall joints | lin.m. | 40 |
| Internal corner puttying (90 degrees) | lin.m. | from 80 |
| Sanding putty | sq.m. | 80 |
| Painting (2-3 layers) | sq.m. | from 130 |
| Standard wallpapering | sq.m. | from 80 |
| Wallpapering with pattern matching | sq.m. | from 120 |
| Fiberglass wallpaper installation | sq.m. | from 120 |
| Non-woven wallpaper installation | sq.m. | from 120 |
| Priming: Grund-Dermit, Betonkontakt | sq.m. | 50 |
| Straight corner bead installation | lin.m. | 80 |
| Radius corner bead installation | lin.m. | 150 |
| Frieze/molding installation | lin.m. | from 70 |
| Joint sealing on drywall | sq.m. | 80 |
| Priming | sq.m. | 40 |
| Frieze/molding painting | lin.m. | from 80 |
| Waterproofing | sq.m. | 120 |
| Work Description | Unit | Price (UAH) |
|---|---|---|
| Ceiling drywall installation (60×60 grid) | sq.m. | from 250 |
| Ceiling drywall installation (40×40 grid) | sq.m. | from 300 |
| Drywall box construction | lin.m. | from 200 |
| Drywall installation (2-3 levels) | lin.m. | from 250 |
| Radius element installation | lin.m. | from 250 |
| Ceiling mineral wool insulation (5 cm thickness) | sq.m. | from 120 |
| Starting putty (1 layer) | sq.m. | from 140 |
| Finishing putty (1 layer) | sq.m. | from 140 |
| Acrylic putty (1 layer) | sq.m. | from 140 |
| Sanding putty | sq.m. | 90 |
| Painting (2-3 layers) | sq.m. | from 160 |
| Fiberglass wallpaper installation | sq.m. | from 120 |
| Non-woven wallpaper installation | sq.m. | from 120 |
| Joint sealing on drywall | lin.m. | 80 |
| Non-standard drywall joint cutting | lin.m. | 40 |
| Priming | sq.m. | 40 |
| Work Description | Unit | Price (UAH) |
|---|---|---|
| Tile laying | sq.m. | from 600 |
| Grouting | sq.m. | from 100 |
| Kitchen backsplash tiling | sq.m. | from 1000 |
| Tile frieze installation | lin.m. | from 200 |
| Tile trimming | lin.m. | 110 |
| Inspection hatch installation | pcs. | from 600 |
| 45-degree tile miter cutting | lin.m. | from 200 |
| Grinding non-standard cuts | lin.m. | from 180 |
| Decorative element installation | pcs. | 300 |
| Cutting holes in tiles | pcs. | 150 |
| Priming | sq.m. | from 130 |
| Work Description | Unit | Price (UAH) |
|---|---|---|
| Replacement of cold and hot water risers | pcs. | from 3000 |
| Sewer riser replacement | pcs. | from 3500 |
| Radiator installation | pcs. | from 450 |
| Pipe laying | lin.m. | from 40 |
| Wall chasing (grooving) | lin.m. | from 100 |
| Bathtub installation | pcs. | from 1800 |
| Shower cabin installation | pcs. | from 3000 |
| Toilet installation | pcs. | from 600 |
| Sink installation | pcs. | from 1000 |
| Heated towel rail installation | pcs. | from 600 |
| Washing machine connection | pcs. | from 250 |
| Water meter installation | pcs. | from 600 |
| Coarse filter installation | pcs. | from 600 |
| Water heater (boiler) installation | pcs. | from 800 |
| Wall-hung toilet installation system | pcs. | 2200 |
| Installation of mounting fixtures for appliances | pcs. | from 300 |
| Built-in mixer installation | pcs. | from 1500 |
| Shower bar installation | pcs. | from 1000 |
| Heating riser replacement | pcs. | from 3000 |
| Water point (outlet) | pcs. | 550 |
| Mixer installation | pcs. | from 300 |
| Valve installation | pcs. | from 100 |
| Heating point (outlet) | pcs. | 600 |
| Work Description | Unit | Price (UAH) |
|---|---|---|
| Dismantling of reinforced concrete structures | unit | Negotiable |
| Dismantling of bathroom cabin block | unit | 6000 |
| Dismantling of bathroom partition | unit | 1500 |
| Boiler dismantling | unit | 100 |
| Bathtub dismantling | unit | from 200 |
| Toilet dismantling | unit | 150 |
| Drywall wall dismantling | sq.m. | from 60 |
| Drywall partition dismantling | sq.m. | 80 |
| Door block dismantling | unit | from 200 |
| Linoleum removal | sq.m. | 40 |
| Ceiling cleaning from glue | sq.m. | from 120 |
| Wardrobe dismantling | unit | Negotiable |
| Wallpaper removal | sq.m. | from 25 |
| Dismantling of paneling, fiberboard, chipboard, parquet | sq.m. | from 40 |
| Baseboard removal | sq.m. | from 15 |
| Tile removal | sq.m. | from 70 |
| Laminate removal | sq.m. | from 40 |
| Washing off lime/chalk from the ceiling | sq.m. | from 80 |
| Removing water-based paint from the ceiling | sq.m. | from 100 |
| Dismantling of polystyrene ceiling tiles | sq.m. | 40 |
| Dismantling of drywall ceilings | sq.m. | 90 |
| Armstrong ceiling dismantling | sq.m. | 60 |
| Removing oil paint (starting price) | sq.m. | from 150 |
| Dismantling of 0.5-brick thick masonry | sq.m. | from 90 |
| Dismantling of 1-brick thick masonry | sq.m. | from 200 |
| Wood paneling dismantling | sq.m. | from 60 |
| Dismantling openings in panel houses up to 14 cm | unit | 2500 |
| Work Description | Unit | Price (UAH) |
|---|---|---|
| Brick partition installation | pcs. | from 10 |
| Gas block partition laying | pcs. | from 40 |
| Foam block partition laying | pcs. | from 40 |
| Slag block partition laying | pcs. | from 50 |
“`


























We are always glad to see you in our office, where we can discuss in detail the details of the future design project.

Submit them in the form below

comment